05-26-2023, 02:08 PM
More work today since weather is bad. Regrounded power switch. Old ground wire had broken off (before I even started working). I resoldered it with a larger iron, in a better location.
Added a new ground point on the end of the Bakelite container that contains cap #40.
Working on cap 42, added 41 in a better location, attached to new ground point.
Waiting on new colored wires and OPT in mail.
Added a new ground point on the end of the Bakelite container that contains cap #40.
Working on cap 42, added 41 in a better location, attached to new ground point.
Waiting on new colored wires and OPT in mail.