16B Cathedral Cabinet Restoration
#17

[Image: https://live.staticflickr.com/65535/5133...3ec2_c.jpg]
All of the delamination has been re-glued, the extra holes plugged, the inside veneer patched and the outside sanded. The wrap is now ready for veneer.

[Image: https://live.staticflickr.com/65535/5134...a7e2_c.jpg]
Gluing the veneer. I use yellow wood glue thinned with water, about two and a half to three parts glue to one part water, I use the TLAR (That Looks About Right) system on that. I brush a coat of glue on about the top third of the wraparound and on the veneer. In this photo, The glue has been applied, the wrap and veneer have been placed in the clamp fixture. The bolts at the bottom will now be tightened (there are four on each side). This will pull the band down tight and clamp the veneer. There is a layer of felt on the inside of the band and also under the wrap, this insures an even clamp pressure. The clamp fixture doesn't apply much pressure to the lower side portions of the wrap so, only the upper curved portion is glued in this fixture. After the upper part has dried, the wrap will be removed and the lower side portions will be glued and clamped using flat clamp boards.

M R Radios   C M Tubes


Messages In This Thread
RE: 16B Cathedral Cabinet Restoration - by GarySP - 07-16-2021, 02:06 PM
RE: 16B Cathedral Cabinet Restoration - by Steve Davis - 07-28-2021, 01:30 PM
RE: 16B Cathedral Cabinet Restoration - by morzh - 09-05-2021, 06:04 PM