01-16-2021, 08:22 PM
Reassembly has begun. I started with the RF section, riveting all of the tube sockets and terminal strips back in. all of the resistors are just out of tolerance so i will replace all of them. Caps will be re-stuffed. Some were changed previously and I can't re-stuff them so I'll find others to substitute and re-stuff. I'll check the micas as best I can. while it seems I can get a good ground to the chassis under the rivets, I'm a bit concerned that the plating could present a problem in the future so I am running around wire to all ground points and soldering a couple of those to the chassis. I don't like tacking down ground problems.